导读

在市场竞争的过程中,我们应该对建筑业的发展趋势有一个清晰的认识。毕竟,在复杂的现实环境中,只有逐步扩大防水钢板的应用,才

在市场竞争的过程中,我们应该对建筑业的发展趋势有一个清晰的认识。毕竟,在复杂的现实环境中,只有逐步扩大防水钢板的应用,才能使越来越多的建设项目提高防水处理水平。正是由于这些客观因素的不断形成,使整个行业的发展水平有了很大的提高。采用30cm宽、3mm厚的防水钢板加工而成,两侧25 mm弯成45度角,防水板安装在混凝土墙或板厚度中间,且防水板中心线略低于混凝土施工缝位置,使防水板中心线与混凝土施工缝灌浆后的施工缝重合,每边150 mm。 固定两根垂直于底板的12钢筋,将止水钢板置于两根钢筋的芯部,将止水钢板穿过一根度钢筋,将止水环焊接在度钢筋上,并将止水带之间的后跟和尾部焊接环和止水钢板。钢板和橡胶止水钢板的强度不如橡胶止水钢板,其优点不如橡胶止水钢板。其中最明显的一个缺陷是生锈,后期很难处理。因此,施工时应尽量选用橡胶止水钢板。安装前应根据测得的水平线控制水平标高,并根据标高进行止水。In the process of market competition, we should have a clear and clear understanding of the development trend of the construction industry. After all, in the complex real environment, only by gradually expanding the application of water-proof steel sheets, can more and more construction projects improve the level of waterproof treatment. It is because of the continuous formation of these objective factors that the development level of the whole industry has been greatly improved.    Using 30 cm wide and 3 mm thick water-proof steel plate, the steel plate is machined, the two sides are 25 mm bent into 45 degrees angle, the water-proof board is installed in the middle of the thickness of concrete wall or slab, and the center line of the water-proof board is slightly lower than the position of the concrete construction joint, so that the center line of the water-proof board coincides with the construction joint after the grouting of the concrete construction joint, 150 mm on each side.    Fixed two 12 # steel bars perpendicular to the bottom plate, placed the water-stop steel plate in the core of two steel bars, penetrated the water-stop steel plate through a degree steel bar, and welded the water-stop ring on the degree steel bar, and welded the heel and tail between the water-stop ring and the water-stop steel plate. Steel plate and rubber water-stop steel plate are not as strong as rubber water-stop steel plate, and their advantages are not as good as rubber water-stop steel plate. One of the most obvious faults is rust, which is difficult to deal with in the later stage. Therefore, rubber water-stop steel plate should be selected as far as possible for construction. Before installation, the horizontal elevation should be controlled according to the measured level line, and the water-stop plate should be carried out according to the elevation. Installation.

 
(文/钢源网)
打赏
免责声明
• 
本文为钢源网原创作品,作者: 钢源网。欢迎转载,转载请注明原文出处:https://www.twgangyuan.com/news/show-1349.html 。本文仅代表作者个人观点,本站未对其内容进行核实,请读者仅做参考,如若文中涉及有违公德、触犯法律的内容,一经发现,立即删除,作者需自行承担相应责任。涉及到版权或其他问题,请及时联系我们gangyuanwang@163.com。
 

(c)2008-2019 钢源网 All Rights Reserved

冀ICP备13006368号-9

购物车
客服电话
网站二维码

扫一扫
联系我们

返回顶部